

Assembly workshop AGV transfer
|
|||||
Basic road conditions: |
|||||
Pavement requirements: ground difference ± 5mm / ㎡ |
|||||
Transport process: |
|||||
The AGV scheduling system is docked with the MES system. The AGV takes the finished system to the finished product off-line point to pick up the finished product and send it to the designated location, then wait for the instruction or enter the next task |
|||||
|
|||||
Drive unit: |
|||||
Steering wheel drive |
|||||
Communication equipment: |
|||||
Wireless WIFI |
|||||
|
|
||||||
|
||||||
|