A well-known independent brand new energy vehicle power battery assembly project. The project adopts advanced flexible assembly concept, which can realize the whole process of parts uploading-following-synchronous assembly-loading.
CSG Huaxiao has designed and built a flexible assembly line that integrates review parts-parts loading-review main line models-following the synchronization main line-automatic lifting-manual fine-tuning-assembly in one body, based on the man-machine Steps are added on both sides of the project to reduce the work intensity of the workers by 30%, and the equipment activation rate is over 99.5%.
CSG Huaxiao provides a one-stop solution from preliminary analysis, scheme design, prototype testing, installation and commissioning, and later maintenance. It takes 40 days to complete relevant installation and commissioning. After the project is put into production, the operation is stable and reliable, and it has become a star product in the industry, which has been well received by users.