Solutions
Products
About us
News
English
中文
ENGLISH
Top
Login
|
register
Nickname
|
quit
Search
%{tishi_zhanwei}%
Home page
Unload
Delivery
Finished Product
Subpackage
Final Assembly
Off-site
Select Industry
Select Process type
Select Features
condition:
clear condition
Assembly flexible transformation
Assembly flexible transformation
A flexible transformation project of a heavy truck production and assembly line of a world's second largest market value engineering machinery group.
Keyworks:
[AGV,SPS,heavy truck,flexible]
DETAIL
Instrument flexible assembly line
Instrument flexible assembly line
For a first time, a well-known independent brand introduced the flexible assembly line project of the assembly shop. The "three flows in one" of parts flow, assembly flow and finished product flow have been realized.
Keyworks:
[instrumentation,subassembly,three-in-one,traction,assembly flow]
DETAIL
Power battery assembly
Power battery assembly
A famous independent brand new energy vehicle power battery assembly project realizes the whole process of parts uploading-following-simultaneous assembly-loading
Keyworks:
[assembly,power battery,flexible,new energy,time of flight]
DETAIL
Secondary logistics automatically goes online
Secondary logistics automatically goes online
A luxury brand China's first electric vehicle factory assembly secondary logistics project.
Keyworks:
[AGV,Assembly,Control Box,Secondary Logistics]
DETAIL
Battery pack
Battery pack
The industry's first battery-assembled AGV realizes the whole process of automatic production of parts assembly, loading, subassembly, off-line storage
Keyworks:
[agv,pack,three-in-one,offline,auto flip]
DETAIL
Fully automatic logistics
Fully automatic logistics
For the first time, the introduction of the three-axis AGV was carried out automatically, and the whole process of warehouse-concentration area-line-side warehouse was invested independently.
Keyworks:
[agv,automatic carrying,new energy,distribution,visualization]
DETAIL
Warehousing AGV application
Warehousing AGV application
The first domestic bank introduced the AGV + intelligent vault project, which realized the automation of management links such as warehouse entry, inventory, sorting and unpacking.
Keyworks:
[bank,AGV+,intelligent vault,WMS system,PTL]
DETAIL
<
1
2
>