

Architecture

Flexible logistics solutions
It is composed of higher-level management system, AGV dispatching system, energy supply system, various types of AGV carts, and various auxiliary equipment systems.
Support compatible warehouse management system (WMS), manufacturing management system (MES), enterprise resource planning system (ERP) to meet the requirements of various industries.
Architectural advantages

Standardized, modular system, quickly support the establishment of applications

Wireless network, nearby access, safe and reliable, smart and fast

Support mass device access

Daily service (real-time monitoring, monthly report), emergency response
Recommended Products
Advantages

Flexible production
Support mixed-line production of multiple types of products; three-in-one flow of parts, manufacturing, and finished products; support online pop-up of work-in-process without affecting the entire line of production; flexible factory layout.

Parts
flow

Manufacturing
flow

Production
flow
Quick response
Fast commissioning: quick introduction and quick layout; no civil engineering required compared to traditional lines;
Fast maintenance: no need to shut down the entire line for maintenance, and quickly eliminate the current station failure;
Fast product switching: quick transformation and transformation, quick response to production needs.

Put into
operation fast

Fast
maintenance

Fast
transformation


Maximize resource allocation
Save money: no one-time investment, can be invested step by step according to production capacity, reducing financial costs;
Provincial infrastructure: no civil engineering such as steel structure and foundation is required;
Space saving: no need to regulate the site, you can make full use of the plant space.

save
money

Provincial base station

Space
saving
Edge security
The systematic and standardized path can effectively avoid the collision between AGV and the wall, and between AGV and the cargo.

Obstacle detection

Safety edge

Customer Benefits

High rate of return
The investment can be recovered within 2-3 years.

Short project cycle
The implementation period is generally 3 months.

reduce manufacturing cost
Reduce fixed costs, transportation costs, labor costs,
and learning costs.

Environment optimization
No noise, no exhaust, no radiation, and low power, creating a comfortable industrial park.
Case Study
Links:
Follow us:
Address: No. 110 Kejing Road, New District, Suzhou, Jiangsu, China
Tel:+086 0512 68088856 / 62698601
E-mail:sales@huaxiao.com.cn
Huaxiao Precision Industry (Suzhou) Co., Ltd. Copyright © 2020 All Rights Reserved 苏ICP备17047230号-1
Consulting on final assembly logistics solutions